Sensors

HydroQC sensor description.

Overview

The integration defines 41 sensors and 18 binary sensors. Only the entities that apply to the configured rate are created for a contract. Entity names are translated by Home Assistant (English, French and Spanish); the names below are the English ones.

Entities marked Diagnostic are shown in the Diagnostic section of the device and are excluded from default dashboards. Some diagnostic entities are also disabled by default; enable them in the entity settings if needed.

Account

EntityExampleDescription
BalanceCA$123.43Current account balance

Current billing period

EntityExampleDescription
Billing Period Day19Day number in the current billing period (Diagnostic)
Billing Period Duration61Total number of days in the current billing period (Diagnostic)
Bill Total to DateCA$108.10Cost of your consumption for the period so far
Projected BillCA$318.15Projected cost of consumption at the end of the billing period
Daily Bill AverageCA$5.69Average cost per day for the period (Diagnostic)
Daily Consumption Average60.5 kWhAverage consumption per day for the period
Total Consumption1149 kWhConsumption so far in the current period
Projected Total Consumption3,432 kWhProjected consumption at the end of the billing period
Average Temperature15 °CAverage temperature for the current period, as calculated by Hydro-Québec
Average kWh CostCA$0.09/kWhAverage cost per kWh for the period
Current RateDPCCurrent rate code (D, DT, DPC, M, M-GDP)
Rate Option—Current rate option

Dual-energy rates (DT and DPC)

EntityExampleDescription
High Price Consumption0 kWhConsumption in the higher price bracket for the current period
Low Price Consumption1149 kWhConsumption in the lower price bracket for the current period
Flex D vs Rate D DifferenceCA$50.52Amount saved (positive) or lost (negative) compared to rate D

Outage

EntityExampleDescription
Outage Status2026-01-15 08:00Start of the next planned outage or of the current unplanned outage (Diagnostic)

The Outage Status sensor exposes the following attributes: end_date, cause, planned_duration, code, state, emergency_level and is_planned. It is unavailable when there is no upcoming or current outage.

Rate-specific entities

Peak event and winter credit entities depend on the configured rate:

Binary sensors

EntityValuesDescription
EPP Activeon / offEqual Payment Plan is active for the current period (Diagnostic, disabled by default)
Portal Statuson / offHydro-Québec portal availability (Diagnostic, disabled by default)

Peak and preheat binary sensors are documented on the Flex D and Winter Credits pages.